WOER New Energy

SOLUTIONS

Charging Solutions
by Application

From 7 kW AC wallboxes to 1,000 A liquid-cooled megawatt charging, the interface, the cable and the thermal path have to be designed as one system. We build for the duty cycle you actually run — and back it with the Group’s own materials, cable and connector supply chain.
APPLICATIONS

Four Duty Cycles, One Engineering Standard

A depot bus that charges twice a day and a mining truck that runs 24 hours put very different stress on the same connector. We size the contact, the cooling and the cable for the cycle you actually run.
Passenger EV Project - WOER New Energy

Passenger EVs

Compact AC and DC interfaces for 400 V and 800 V platforms, from 7 kW home charging to 250 kW public fast charging.
Type 2 AC inlets & sockets
CCS2 DC inlets
Battery pack HV harnesses
Commercial Vehicle Project - WOER New Energy

Commercial Vehicles

High-current assemblies for buses, coaches and trucks that charge on a fixed depot schedule.
Liquid-cooled charging guns
Depot charging cables
HV power distribution
Charging Station Project - WOER New Energy

Public Charging Hubs

Field-proven components for public DC fast charging networks, built for unattended outdoor duty.
Dual-latch DC connectors
Cable management
Retrofit & anti-theft kits
Truck Project - WOER New Energy

Heavy-Duty & Mining

MCS and high-power DC solutions for mining trucks, port equipment and off-road fleets.
MCS 1,000 A connectors
Reinforced cable assemblies
Dust & vibration tested
GROUP SYNERGY

One Group Behind
Every Component

WOER New Energy is a controlled subsidiary of Woer Heat-Shrinkable Material Co., Ltd. (SZSE: 002130, HKEX: 09981) — a group that started with electron-beam modified materials and now supplies new materials, cables, connectors and complete charging assemblies to seven industries.
Industry talent. Close to 100 engineers across materials, electrical, cable and mechanical design, with hands-on installation and after-sales experience in the field.
Vertical integration. Base materials, charging cable, high-voltage connectors, terminals and injection moulding are all made inside the Group, so cost and quality are controlled at the same time.
Proven at scale. More than 2 million ultra-fast charging guns shipped by May 2026, No.1 in industry shipments for five consecutive years, applied from −40 °C to high-altitude and high-salt-fog sites.
High-power leadership. First in China to develop high-power charging products; we take part in standard drafting, demonstration projects and field data collection.
WOER Group industrial chain - new materials and new energy at the core
New Energy Vehicles
Wind Power
Nuclear Power
Healthcare
Defense Industry
Aviation (COMAC)
New Materials
QUALITY ASSURANCE

Nine Checkpoints, One Traceable Batch

Scan the batch code on a finished part and we can tell you who crimped it, on which machine, and which test it passed.

01

MES Scan Loading

The line refuses any material that is not on the work order.

02

Automated Cutting

Length and strip dimensions held to ±0.5 mm.

03

Coaxial Stripping

Shield and insulation removed without nicking the conductor.

04

Terminal Crimping

German crimping presses with force-displacement monitoring.

05

Screw Fastening

Swedish anti-mistake drivers with torque logging.

06

CCD Vision Check

A robotic arm verifies terminal position and polarity.

07

PIN Error Detection

Bent, recessed or wrong pins are rejected before assembly.

08

100% Electrical Test

Continuity, hipot and contact resistance, all written to MES.

09

MES Packing Check

The line will not pack a part that has not passed.
Automated assembly line with MES traceability at WOER New Energy

Certified, and Audited by Our Customers

Four management systems, maintained since 2016 and audited every year by automotive OEMs and charging network operators.

ISO 9001

Quality management · 2017

IATF 16949

Automotive quality · 2016

ISO 14001

Environment · 2018

ISO 45001

Occupational safety · 2017
In-house test bench: pull-off force, CMM, drop test, coating thickness, temperature rise, thermal shock / damp heat / high-temperature ageing, vibration, terminal cross-section analysis, CCD vision and PCB burn‑in.
Environmental and material test laboratory at the WOER Group Research Institute
R&D STRENGTH

600 Engineers,
One Research Institute

The Group Research Institute runs four units — Materials, Automation, Information Technology and the Testing Center — and trains the technical staff of every subsidiary. It was designated a National Enterprise Technology Center in 2018 and a Shenzhen Key Enterprise Research Institute in 2021.

600+

R&D and technical staff across the Group

¥300M+

Annual R&D investment, for many years running

498

Authorised patents at WOER New Energy (48 invention, 302 utility, 145 design)

1,600 kV

Dielectric withstand capability of the power high-voltage laboratory
Power HV lab · 1,600 kV
CNAS-accredited material lab
Combustion testing lab
Cable laboratory
EV power-transmission component lab
HOW WE WORK

From Requirement to Shipment

01

Requirement Review

Rated current, voltage class, mating cycles, environment and the standard you must meet.

02

Design & Simulation

3D modelling, thermal and tolerance analysis, then a drawing for your approval.

03

Tooling & Prototyping

In-house tooling, first articles and validation samples within weeks.

04

Mass Production

Automated crimping and 100% electrical test before every shipment.

Not Sure Which Connector Fits Your Platform?

Send us the voltage class, the duty cycle and the standard you have to meet. Our engineers will map it to the right interface and come back with a proposal.